
Congratulations to the Mirant Potomac River Generating Station in Alexandria, VA! In partnership with Wright Line, User Centered Design Services, and Smith LaRock Architecture, Foxboro has awarded Mirant a Control Room Makeover featuring a prize package valued up to $350,000!
Situation
The Potomac River Generating Station consists of five units that originally had three boiler control areas and a separate electrical control room. The boiler-turbine controls for three units have been consolidated into their Electrical Control Room. Now, with plans to move the boiler-turbine controls for the remaining two units into this central control room, Mirant is facing additional challenges…
| Before 3 unit consolidation |
|---|

| Challenges - Information access - enable the operator to effectively view and act on information from multiple consoles and existing control panel
|
| |
| Before 5 unit consolidation |
|---|
More challenges...
|  |
| |
| After 5 unit consolidation |
|---|
Stay tuned... The Control Room Makeover team consisting of Foxboro, Wright Line, User Centered Design Services, and Smith LaRock Architecture will begin working with Mirant to transform their Potomac River site with a prize package including: |
Images and details of the transformation will periodically be updated on this page, so check back often for the latest information!